General Guidelines
Sequence of Events
For:
New Construction-Exterior
1. Clean home with Log Wash. Be sure to remove mill
glaze.
2. Borate treatment (optional but recommended). Allow wood to dry.
3. Apply Energy Seal and Check Mate 2. Allow to cure at least 3 hours.
4. If more than 5 to 7 days have passed since step 1 or 2, wash down
surface with Log Wash solution. Rinse well and allow to dry.
5. Apply Lifeline Stain.
6. Chink home if applicable.
7. Apply Log End Seal.
8. Apply Advance Topcoat.
General Guidelines
Sequence of Events
For:
New Construction-Interior
1. Clean interior surface.
2. Stain with Lifeline Interior.
3. Apply a topcoat of Acrylic Gloss or Satin.
Note: Using these interior finishes will make it easier to clean
interior walls and keep them from absorbing cooking orders. If the
homeowner does not want a color on their interior walls, they can use
Prelude, which is clear and contains UV Boost, for the first coat and
then top with Acrylic Gloss or Satin.
4. Chink interior if applicable with Perma-Chink. Acrylic Gloss or
Satin can be applied on top of Perma-Chink to help keep it clean.
5. Apply Sure Shine Gloss or Satin to interior floors.
|